What is a large load?

A large load is a single customer whose demand is big enough for the grid operator to study and manage it individually. Data centers and Bitcoin mines are the usual examples.

How it works

Grid operators set a threshold above which a new load must go through its own interconnection process, and may require it to reduce demand in emergencies.

Why it matters

In Texas, ERCOT's large-load process decides when a new site gets power, so it shapes where AI capacity is built.

Live figures: Data center power.