How much does it cost to build a data center?
Building a data center in the US costs about $17.6 million per megawatt of IT load on average in 2026, according to Cushman & Wakefield, across a range of $8.9 million to $23.3 million depending on the market. That excludes the servers and GPUs. Costs per megawatt rose 21% since late 2024, driven by electrical equipment, copper and long lead times. This guide breaks the cost down, shows what AI adds, and works through examples from 10 MW to 1 GW.
Published November 20, 2026. Cushman & Wakefield figures are from its 2026 Data Center Development Cost Guide (August 2026) as reported in the sources.
Cost per megawatt
| Measure | Figure | Source |
|---|---|---|
| All-in new build, US and Canada average | $17.6M per MW of IT load | Cushman & Wakefield, 2026 |
| Range across markets | $8.9M to $23.3M per MW | Cushman & Wakefield, 2026 |
| Change since late 2024 | +21% (general inflation about 5%) | Cushman & Wakefield, 2026 |
| Powered land, primary US markets | $584,000 per MW (+51% in a year) | Cushman & Wakefield, 2026 |
| Shell and core only | $11.3M per MW (2026 forecast) | JLL |
| US average construction cost | $12.08 per watt | Turner & Townsend, 2026-27 |
| Chicago | $13.28 per watt | Turner & Townsend, 2026-27 |
The three firms measure different scopes, so their figures do not compare directly. All exclude servers, GPUs and networking. Cushman & Wakefield names Texas markets among the lowest-cost, and Silicon Valley, Chicago, New York, Northern New Jersey, Toronto and Los Angeles among the most expensive.
What a project costs
At the 2026 average of $17.6M per MW, and the market range:
| IT load | At the average | Low-cost market ($8.9M/MW) | High-cost market ($23.3M/MW) |
|---|---|---|---|
| 10 MW | $176M | $89M | $233M |
| 50 MW | $880M | $445M | $1.17B |
| 100 MW | $1.76B | $890M | $2.33B |
| 300 MW | $5.28B | $2.67B | $6.99B |
| 1 GW | $17.60B | $8.90B | $23.30B |
For scale: a GB200 or GB300 NVL72 rack draws about 132 to 140 kW, so 100 MW holds roughly 700 such racks. See GPU power and cooling requirements.
Where the money goes
| Category | Share of a new build |
|---|---|
| Power infrastructure (electrical) | 21% |
| Core, shell and sitework | 17% |
| Contingencies | 16% |
| Site acquisition (land) | 7% |
Equipment prices rose sharply between December 2021 and early 2026: switchgear 60%, copper 46%, generators and motors 33%, cooling equipment 32% and transformers 29%.
The AI premium
- Turner & Townsend: US facilities built for AI cost about 10% more than traditional ones, at $14 to $16 per watt, partly because of liquid cooling.
- JLL: AI tenant fit-out can reach $25 million per MW, on top of the building.
- Racks are far denser: Microsoft's Fairwater runs about 140 kW per rack, against about 8 to 11 kW for an average rack. See our liquid cooling guide.
Lead times
| Item | Lead time |
|---|---|
| Pad-mounted transformers | 68–113 weeks |
| Generators | 60–100 weeks |
| Medium-voltage switchgear | 38–63 weeks |
| Grid connection, primary markets | More than 4 years on average (JLL) |
JLL reports North America had 66 GW under construction in mid-2026, 95% pre-leased, with tenants contracting for 2028 delivery. That is why power, not the building, sets the schedule: see data center power and Texas data centers.
Leasing instead: colocation
- CBRE: the North American primary-market average for 250–500 kW was $196.25 per kW per month at the end of 2025, up 6.6% in a year.
- Early 2026: Northern Virginia $190–$235 and Chicago $200–$230 per kW per month; Dallas-Fort Worth rents were flat year over year.
- Vacancy is tight: 1.4% across primary markets and 0.2% in Northern Virginia in H1 2026. Dallas-Fort Worth had 1,432.8 MW of inventory with 39.6 MW available.
The developers, builders and equipment makers behind these numbers meet at Intelligence Disrupt 2027 in Dallas, March 22–24.
Questions
- How much does it cost to build a data center per MW?
- Cushman & Wakefield's 2026 guide puts the US and Canada average at $17.6 million per MW of IT load, excluding chips and servers, with markets ranging from $8.9 million to $23.3 million.
- How much does a 100 MW data center cost?
- At the 2026 average of $17.6 million per MW, about $1.76 billion for the building and its power and cooling, before any servers or GPUs.
- Why are data center costs rising?
- Cost per MW is up 21% since late 2024 against about 5% general inflation. Switchgear prices rose 60% since 2021, copper 46%, and transformers take 68 to 113 weeks to arrive.
- What is the biggest cost in a data center?
- Power infrastructure, at 21% of a new build, followed by core, shell and sitework at 17%, contingencies at 16% and land at 7%.
- Do AI data centers cost more to build?
- Yes. Turner & Townsend puts US AI facilities at about 10% more than traditional ones, at $14 to $16 per watt, and JLL says AI tenant fit-out can reach $25 million per MW.
- How much does colocation cost?
- CBRE put the average for 250–500 kW deals in North American primary markets at $196.25 per kW per month at the end of 2025. Northern Virginia ran $190 to $235 and Chicago $200 to $230 in early 2026; Dallas-Fort Worth rents were flat year over year.
More guides
- AI data centers: what they are, how they work and what they cost
- GPU cloud: providers, prices and the power behind them
- Liquid cooling for data centers
- Data center power: how much it takes and how to get it
- Bitcoin miners turning into AI and HPC data centers
- Texas data centers: Dallas-Fort Worth and the AI campuses
- Stargate: every OpenAI data center site and where it stands
- NVIDIA GPU power and cooling requirements
- The largest data centers in the world
- PUE and how much power data centers use
Sources
- IREI, Cushman & Wakefield 2026 Data Center Development Cost Guide · 2026-08-20
- CRE Daily, data center construction costs jump 21% · 2026-08-27
- Cushman & Wakefield 2026 cost guide release · 2026-09-03
- JLL, 2026 Global Data Center Outlook · 2026-01-05
- JLL, data center demand in H1 2026 · 2026-08-11
- Turner & Townsend, Data Centre Construction Cost Index 2026-27 · 2026-10-22
- CBRE, North America Data Center Trends H2 2025 · 2026-02-25
- CBRE, Global Data Center Trends 2026 · 2026-06-17
- CBRE, North American data center demand H1 2026 · 2026-08-27
- Microsoft, Azure AI superfactory architecture · 2025-11-12
The power is on this floor. Be in the room.
March 22–24, 2027 · Irving Convention Center · Dallas
Intelligence Disrupt and Mining Disrupt are NOT affiliated with any other brands, groups, events, meetups, individuals, sponsors, exhibitors, agents, or referrals, except the Industry Ambassadors listed on this site. We do not sell any lists. Beware of scams claiming otherwise.
There are imitators and scammers using our name to solicit sponsors and attendees. Always verify directly through our official Telegram group. Stay vigilant!
Intelligence Disrupt Policy: No refunds. No outside food or drinks. No third-party event solicitations.
Unauthorized solicitation, sales, advertising, product demonstrations, or distribution of promotional materials, including magazines, brochures, flyers, catalogs, business literature, and promotional giveaways, is strictly prohibited anywhere within the event venue unless expressly authorized by Intelligence Disrupt.
Marketing activities are reserved exclusively for approved exhibitors, sponsors, and authorized event partners. Attendees found engaging in unauthorized promotional activities may be required to cease immediately, surrender promotional materials, and may have their event credentials revoked without refund at the sole discretion of event management.