Measured by power in use, the largest data center in the world in November 2026 is Amazon's Project Rainier in Indiana, at about 1 GW of IT load, followed closely by xAI's Colossus 2 in Memphis. Both were built for AI. This page ranks the biggest operating campuses by power and lists the largest ones announced, with the owner, location and status.
Published November 20, 2026. Current power figures are Epoch AI's estimates from satellite imagery and filings, as of the dates shown; company statements are noted alongside.
Largest operating data centers
Ranked by IT power in use, as estimated by Epoch AI in its November 2026 dataset. Company statements differ in places; xAI says Colossus 2 reached 1 GW in January 2026, and Oracle said 618 MW of Abilene was delivered by September 2026.
| # | Campus | Owner | Location | IT power now | Planned |
|---|---|---|---|---|---|
| 1 | Project Rainier | Amazon (Anthropic) | New Carlisle, IN | About 1,037 MW | About 1,925 MW by 2028 |
| 2 | Colossus 2 | xAI | Memphis, TN | About 946 MW (xAI claims 1 GW) | About 1,531 MW by Q1 2027 |
| 3 | Stargate Abilene | Oracle, OpenAI (built by Crusoe) | Abilene, TX | About 824 MW | About 1.2 GW |
| 4 | Fairwater Atlanta | Microsoft | Fayetteville, GA | About 636 MW | No growth planned |
| 5 | DayOne Nusajaya | DayOne | Johor, Malaysia | About 473 MW | Not published |
| 6 | Prometheus | Meta | New Albany, OH | About 471 MW | About 1 GW |
| 7 | Fairwater Wisconsin | Microsoft | Mount Pleasant, WI | About 369 MW | About 2.26 GW by 2028 |
| 8 | Pryor | Pryor, OK | About 368 MW | Not published | |
| 9 | Colossus 1 | xAI | Memphis, TN | About 340 MW | Not published |
Before the AI build-out, the biggest campuses were measured in floor space rather than power. Switch's Citadel campus near Reno was designed in 2017 for up to 650 MW and 7.2 million square feet, and China Telecom's Inner Mongolia Information Park held about 700,000 servers in 2018; neither publishes its power in use.
Largest planned campuses
| Campus | Owner | Location | Announced capacity | Timing |
|---|---|---|---|---|
| Project Matador | Fermi | Near Amarillo, TX | About 17 GW | 600 MW hyperscaler development from 2027 |
| Hyperion | Meta | Richland Parish, LA | 5 GW | 2 GW by 2030; more than 7 GW of gas plants contracted |
| UAE–US AI Campus | G42 with OpenAI, Oracle | Abu Dhabi | 5 GW (1 GW Stargate cluster) | First 200 MW expected in 2026 |
| Stargate New Mexico | OpenAI, Oracle | Doña Ana County, NM | About 2.2 GW (Epoch) | Q4 2028 |
| Frontier | Vantage (OpenAI, Oracle) | Shackelford County, TX | 1.4 GW | First building H2 2026 |
| Stargate Michigan | OpenAI, Oracle | Saline Township, MI | About 1.4 GW (Epoch) | Q4 2028 |
| Stargate Milam County | SB Energy, OpenAI | Milam County, TX | 1.2 GW | Under construction |
Track every OpenAI site in our Stargate tracker and the Texas campuses in Texas data centers.
Why they are this big
Training frontier AI models takes hundreds of thousands of GPUs working as one, and a single NVL72 rack draws 125 to 140 kW. A gigawatt campus holds several hundred thousand accelerators, which is why sites are now chosen by power first: on-site gas, existing grid connections and, increasingly, sites first built for Bitcoin mining. See GPU power and cooling requirements and data center power.
The builders, power producers and operators behind these campuses meet at Intelligence Disrupt 2027 in Dallas, March 22–24.
Questions
- What is the largest data center in the world?
- By power in use, Amazon's Project Rainier in New Carlisle, Indiana, at about 1.04 GW of IT load according to Epoch AI's November 2026 estimate, followed by xAI's Colossus 2 in Memphis at about 0.95 GW.
- What was the first gigawatt AI data center?
- xAI claimed it on January 17, 2026, when Elon Musk said Colossus 2 was the first gigawatt training cluster. Epoch AI puts both Colossus 2 and Project Rainier at roughly 1 GW of IT load.
- What is the largest data center being planned?
- Fermi's Project Matador near Amarillo, Texas, which it says is expected to ramp to about 17 GW, followed by Meta's Hyperion in Louisiana (5 GW) and the UAE–US AI campus in Abu Dhabi (5 GW).
- How big is Stargate Abilene?
- About 1.2 GW planned. Oracle said in September 2026 that six of the eight buildings, 618 MW and 75% of capacity, had been delivered.
- What is the difference between IT power and facility power?
- IT power is what the computers draw. Facility power adds cooling and other overhead; for these campuses it runs about 1.2 to 1.4 times the IT load.
- Where is Microsoft Fairwater?
- In Mount Pleasant, Wisconsin, and Fayetteville, near Atlanta, Georgia. Microsoft links the two into one AI system.
More guides
- AI data centers: what they are, how they work and what they cost
- GPU cloud: providers, prices and the power behind them
- Liquid cooling for data centers
- Data center power: how much it takes and how to get it
- Bitcoin miners turning into AI and HPC data centers
- Texas data centers: Dallas-Fort Worth and the AI campuses
- Stargate: every OpenAI data center site and where it stands
- NVIDIA GPU power and cooling requirements
- How much does it cost to build a data center?
- PUE and how much power data centers use
Sources
- Epoch AI, frontier data centers dataset · 2026-11-19
- SiliconANGLE, AWS opens Project Rainier · 2025-10-29
- Epoch AI, Colossus 2 · 2026-11
- Epoch AI, Stargate Abilene · 2026-11
- Microsoft, Fairwater AI superfactory · 2025-11-12
- Microsoft, Fairwater Wisconsin · 2025-09-18
- TechCrunch, Meta's Prometheus and Hyperion · 2025-07-14
- Switch, Tahoe Reno 1 opens · 2017-02-15
- Fermi, third-quarter 2026 results · 2026-11-12
- OpenAI, Stargate UAE · 2025-05-22
- Epoch AI, OpenAI Stargate: where the US sites stand · 2026-04-20
- Vantage Data Centers, Frontier campus · 2025-08-19
The power is on this floor. Be in the room.
March 22–24, 2027 · Irving Convention Center · Dallas
Intelligence Disrupt and Mining Disrupt are NOT affiliated with any other brands, groups, events, meetups, individuals, sponsors, exhibitors, agents, or referrals, except the Industry Ambassadors listed on this site. We do not sell any lists. Beware of scams claiming otherwise.
There are imitators and scammers using our name to solicit sponsors and attendees. Always verify directly through our official Telegram group. Stay vigilant!
Intelligence Disrupt Policy: No refunds. No outside food or drinks. No third-party event solicitations.
Unauthorized solicitation, sales, advertising, product demonstrations, or distribution of promotional materials, including magazines, brochures, flyers, catalogs, business literature, and promotional giveaways, is strictly prohibited anywhere within the event venue unless expressly authorized by Intelligence Disrupt.
Marketing activities are reserved exclusively for approved exhibitors, sponsors, and authorized event partners. Attendees found engaging in unauthorized promotional activities may be required to cease immediately, surrender promotional materials, and may have their event credentials revoked without refund at the sole discretion of event management.